Connectivity · Day one on site

Internet on site the day you break ground.

Construction and temporary sites need connectivity long before any fibre exists. We deploy rapid 4G/5G fixed wireless — and Starlink where cellular is weak — so the site office, welfare cabins, CCTV and cloud systems are online from the first day.

Live in daysScalableFully managed
Rapid deploy● live on site
STARLINK 4G / 5G MAST SITE CABIN RCG managed link INTERNET
What's included

Everything the site needs online, from the first cabin.

One managed service covers the whole site — the office, the welfare cabins, the cameras and the cloud tools your teams depend on — without waiting months for a fibre installation.

Rapid-deploy 4G/5G

Fixed wireless with high-gain antennas, pre-staged and live within days — no waiting on a fibre order.

Starlink for weak signal

Where cellular coverage is poor, low-earth-orbit satellite keeps the site fast and reliable anywhere.

Office & welfare Wi-Fi

Reliable, secure Wi-Fi across the site office and welfare cabins so every team can work.

CCTV & site security

Connectivity for site CCTV, alarms and access control, integrated so security is live on day one.

Static IP included

A fixed public IP for remote access to CCTV, systems and site management from anywhere.

Managed & relocatable

Fully managed and monitored, scaled as you grow, then relocated or removed when the phase ends.

How we deliver

Connectivity that follows the project, phase by phase.

01

Survey

We check coverage, line-of-sight and power, and design the fastest reliable link for your plot.

02

Deploy

Pre-staged 4G/5G or Starlink kit is mounted, powered and tested — often live in a single visit.

03

Scale

As offices, welfare and compounds multiply, we add capacity and coverage to match the ramp-up.

04

Relocate or remove

At handover we move the kit to your next phase or plot, or remove it cleanly from site.

Built for the site lifecycle

One link that keeps pace with the build.

A construction site is never static, and neither is its connectivity. We design a service that flexes with every stage — from the first cabin on a muddy field to a fully manned compound at fit-out, then gone at handover.

From enabling works through main build and fit-out to handover, the same managed link grows from two users to two hundred. When a phase closes, we move the kit between phases or plots — so you never pay for infrastructure you're not using.

Days
from survey to live on site
2–200
users as the site scales up
24/7
monitoring and support
0
fibre installs to wait on
Questions

Construction site internet — your questions answered.

How fast can we be online on site?
Because we don't wait for fibre, a rapid-deploy 4G/5G fixed wireless link can be live within days of a site survey — often in a single visit. We pre-stage and configure the kit so engineers simply mount, power and test on the day.
What if there's no fibre and the mobile signal is poor?
That is exactly what we plan for. We use high-gain external antennas and the strongest carrier for your location, and where cellular is genuinely weak we deploy Starlink so the site still gets a fast, reliable connection. It's the same approach behind our rural internet connectivity.
Can it scale as the site grows?
Yes. The same managed link scales from a two-person cabin at enabling works up to hundreds of users across offices, welfare and compounds during main build and fit-out. We add enterprise 4G/5G capacity and coverage as the project ramps up.
Can you handle the CCTV and site security too?
We do. We provide the connectivity and a static IP for remote access, and can integrate site CCTV and security so cameras, alarms and access control are online from day one.
What happens when the project ends?
We remove the equipment cleanly when a phase or project finishes, or relocate it to your next plot or site. Because it's rented and managed — and can include backup and failover where uptime is critical — you only pay for connectivity while you need it.
Rural Connectivity Group

Get your site connected from day one.

Tell us where the site is and what it runs. We'll have you online long before the fibre arrives.